Portal de Bullas

www.portaldebullas.com

Bullas - SpanishBullas - English
detail of Bullas

 

The first phase of construction of the indoor College of Ródenas starts (23/04/2015)

In a couple of months will begin work covering a third of the arena of Bishops Garcia-Ródenas Public School.

The Director General of Educational Institutions, María Dolores Valcarcel, yesterday visited the town of Bullas to finalize details with the Mayor, Pedro Chico, and present the project, located in the bidding phase, the Director of the College, Juan Matias Caballero.

Covering 438 square meters, corresponding to a first phase of a third of the track that has more than 1200 square meters at a cost of 91,800 euros which shall be borne entirely by the Ministry of Education.

According, said the Director General "is anticipated that the works are completed for the start of next year."

For its part, the Mayor was "satisfied" with the performance "part of this project," whose ultimate goal, he said, "is the complete coverage of the track and in the future close in to flag".

Ultimately, improving sports facilities that can be enjoyed by students of the College and by the local residents.

Source: Ayuntamiento de Bullas

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información